Mt Todd Gold Mine
Phone:+ 61 8 8941 9105
  • Mt Todd
    • Open Day Rego Form
    • Industry Capability Network
    • About Us >
      • History of the site
      • Gold Recovery Process
      • Company Overview
      • Our Core Values
      • Vista Gold Australia
      • Key Staff
      • Frequently Asked Questions
    • Care & Maintenance
    • Operations
    • Approvals >
      • Mine Management Plans >
        • MMP Operations 2021.1 >
          • MMP Appendix V Mines Department RFI's
          • MMP Attachment U - EPBC Approval Documents
      • MMP Exploration
      • MMP Care & Maintenance
      • Interfere With A Waterway
      • 2023 NTEPA Referral
  • Environment
    • Waste Discharge Licence >
      • Water Data Index
    • Water Management
    • Gouldian Finch
    • Environmental Impact Statement
    • Tailings
    • Rehabilitation
  • Community
    • The Jawoyn Community
    • Community Engagement
  • Employment
    • Recruitment Advice
  • Media
    • Community Media
    • Media Coverage
    • Company Announcements
  • Gallery
    • Video Files
    • Images
  • Contact Us

2023 NTEPA Referral

Documents Submitted as at 4th AUG-23

Referral Document
   23 09 19 NTEPA Acceptance of Referral Documentation 0.6mb
    23 08 04 NTEPA Referral Response to Letter 1.0mb
     23 08 04 VG SLR Referral Submission V2-20230719 2.5mb
       

              Attachments
                     Attachment R1-2011-5967 Approval-Final-Notice-Signed-180119
                     Attachment R2-Gouldian Finch Literature Review and Habitat Assessment 2
                     Attachment R3-Waste Rock and AMD Management Plan 2022
                     Attachment R4-Erosion and Sediment Control Plan 2022
                     Attachment R5-Stormwater Management Plan
                     Attachment R5-Stormwater Management Plan -Surface Water Management Plans_Part1
                     Attachment R5-Stormwater Management Plan -Surface Water Management Plans_Part2
                     Attachment R5-Stormwater Management Plan -Surface Water Management Plans_Part3
                     Attachment R5-Stormwater Management Plan -Surface Water Management Plans_Part3b
                     Attachment R5-Stormwater Management Plan -Surface Water Management Plans_Part4
                     Attachment R6-Draft GFMP 2
                     Attachment R7-Draft GFOS
                     Attachment R8-Water Management Plan
                     Attachment R9-Water Treatment Plant
                     Attachment R10-Draft GFMM
                     Attachment R11-Weed Management Plan 2022
                     Attachment_r12-flora_and_fauna_management_plan_2022.pdf
                     Attachment R13-DRAFT Dust Monitoring and Mitigation Programme
                     Attachment R14 - Cultural Heritage Management Plan_Redacted version for publication
                     Attachment R15-Closure Plan 2022
                     Attachment R16-WRD Closure Assessment Report(TGI 2020)
                     Attachment R17-Mt Todd Cover Trials Design Procedure
                     Attachment R18-Batman Pit Predictive Geochemical Modelling
                     Attachment R19-Post Closure Pit Lake Water Quality
                     Attachment R20-Reclamation Plan
                     Attachment R21-Community Engagement Plan 2022
          Maps and Figures
                     Fig 1_WRD_Elevation_01
                     Fig 2_Redesigned_Dump_WRD_01
                     Fig 3_FS_EIS_Final_Batman_Pit_Gouldian_01
                     Fig 5 Construction Camp
                     Referral Report - Figure 4
                     Referral Report - Figure 6
             Spatial Data
                     EIS

                           13 EIS Final Batman Pit.dxf
                           Approved_WRD_Boundary_20230627.CPG
                           Approved_WRD_Boundary_20230627.dbf
                           Approved_WRD_Boundary_20230627.prj
                           Approved_WRD_Boundary_20230627.sbn
                           Approved_WRD_Boundary_20230627.sbx
                           Approved_WRD_Boundary_20230627
                           Approved_WRD_Boundary_20230627
                     Proposed changes
                          22 FS Final Batman Pit.dxf
                          23 03 28 Power Station Drawing 2023.kmz
                          2023_s_dmp_v6.dxf
                          Proposed_camp_construction_road_area.cpg
                          Proposed_Camp_Construction_Road_Area.dbf
                          Proposed_Camp_Construction_Road_Area.prj
                          Proposed_Camp_Construction_Road_Area.sbn
                          Proposed_Camp_Construction_Road_Area.sbx
                          Proposed_Camp_Construction_Road_Area
                          Proposed_Camp_Construction_Road_Area.shp
                          Proposed_Camp_Construction_Road_Area
ABN 117 327 509
Disclaimer & Cautionary Note
Picture